1.Typical drawing scale is:
1.图纸比例通常为:
2.Hidden work must:
2.隐蔽工程必须:
3.Pressure test standard is:
3.压力试验标准为:
4.Test passes if:
4.试压合格条件是:
5.Materials must have:
5.材料必须具备:
6.Construction drawings must include:
6.施工图必须包含:
7.Equipment must be:
7.设备安装前必须:
8.Site inspection includes:
8.现场检查分为:
9.Pre-construction inspection does NOT include:
9.施工前检查不包括:
10.In-process inspection focuses on:
10.事中检查重点是: