1.The first step in project planning is: 1.项目规划的首要阶段是:
2.Compliance inspection system aims to: 2.合规检查机制的目的:
3.Water supply pipe velocity range is: 3.给水管道设计流速范围是:
4.Minimum drainage pipe diameter is: 4.排水管最小管径为:
5.Minimum sewage pipe slope is: 5.污水管最小坡度为:
6.Stormwater minimum slope is: 6.雨水管最小坡度为:
7.通气管最小尺寸为: 7.Minimum vent pipe size is:
8.Vent pipe must extend at least: 8.通气管至少伸出屋顶:
9.Vent pipe diameter must be at least: 9.通气管径不得小于排水管的:
10.Vent systems are required to: 10.通气系统用于: