1.If insufficient, backfill thickness must be:
1.不足承载力时回填厚度至少:
2.Compaction coefficient requirement is:
2.夯实系数要求为:
3.Excavations deeper than 1.5m must:
3.深度超过1.5m基坑必须:
4.High groundwater areas require:
4.高地下水区域必须:
5.After excavation, must clean:
5.开挖后必须清理:
6.First step in underground installation is:
6.地下安装标准流程第一步是:
7.Correct pipeline installation sequence is:
7.标准施工流程正确顺序是:
8.Base layer material is usually:
8.垫层材料一般为:
9.Base layer thickness is:
9.垫层厚度为:
10.Pipe lifting must use:
10.吊装管道时必须使用: