1.What is the main purpose of performing a utility location survey?
1.进行地下管线定位测量(utility location survey)的主要目的是什么?
2.Under which condition should spray paint NOT be used to mark property or site boundaries?
2.在哪种情况下不应使用喷漆标记土地或施工现场边界?
3.A ramp is designed at a slope of +3.55%. If it extends 356 feet horizontally, what is the total elevation change?
3.一个坡度为+3.55%的坡道,水平长度为356英尺,其总高差是多少?
4.Beyond general clearing, what does grubbing on a construction site involve?
4.除了普通清理(clearing)外,施工现场的清根(grubbing)还包括什么?
5.From the leveling data provided, how can you determine the instrument’s height?
5.根据提供的水准测量数据,如何确定仪器高(height of instrument)?
6.A triangular lot is 666,500 sq ft and a trapezoidal lot is 1,333,500 sq ft. Convert both areas to acres.
6.一个三角形地块面积为666,500平方英尺,一个梯形地块面积为1,333,500平方英尺。将两个面积转换为英亩。
7.After collecting a sample of contaminated soil, what is the proper next step?
7.采集污染土壤样本后,下一步正确操作是什么?
8.Atterberg Limits are based on which content that causes soil to change consistency?
8.18. 阿特伯格界限(Atterberg Limits)主要基于哪种含量导致土壤状态变化?
9.Which activities are considered part of standard site preparation?
9.哪些活动属于标准施工现场准备工作?
10.Soil particles with sharp edges and unweathered surfaces are known as what type of particles?
10.具有尖锐边缘和未风化表面的土壤颗粒称为什么类型?